CPRI protocol testing–Confirm correct RRH installation and eliminate re-climbs
- May 03, 2016
Hosted by
Webinar Series on Fronthaul Testing
The path towards complete FTTA/RRH site turn-up - in just one field trip.
Part 3: CPRI Protocol Testing–Confirm Correct RRH Installation and Eliminate Re-Climbs
CPRI basics and common issues faced in the field. What is the importance of CPRI link validation before turn-up? What are the best industry practices to validate RRH installation?
- Recap of previous sessions
- CPRI basics
- Challenges and common issues in the field (RRH, SFPs, etc.)
- Importance of CPRI link validation before turn-up
- Best practices in the industry for a complete BBU to RRH testing strategy
- Q&A